Suttle Piling were instructed to install a number of piles for a new rollercoaster at Legoland, Windsor. We installed:
- 198nr 450mmØ CFA bearing piles
- 89nr Contiguous piles
As the piles were installed to support a rollercoaster, each section of bearing piles were set out at different levels, 7 or 8 levels in total, making this a complex project.
The piles were then filled with concrete and cages once complete.
The works were all completed ahead of schedule and without incident.