Suttle Piling was appointed to install 50 metres of sheet piling to stabilise the harbour wall at West Bay. Working within a live harbour environment presented several challenges, including restricted access, the need to install the piles from the water, protecting the surrounding marine ecology, and maintaining the highest safety standards while operating alongside other harbour users.